Project Brief
Client required the Roller Shutter Door Width increasing due to a new contract they have landed, meaning longer lengths of materials are to be brought in and out of their factory. This meant dismantling both the existing Roller Shutter and Double Steel Fire Exit Door to allow for a New Steel Column to be put in place, followed by the Installation of a Larger Roller Shutter and a Smaller Fire Exit Door to suit.
Liaising with Leeds Based Firm Commercial Property Refurb we Dismantled and Installed the Doors in the same day to ensure that there was no security issues and that the works were completed in full prior to the Christmas Break. Commercial Property Refurb carried out cutting of the cladding and flashing off before and after our Installation.
Address: Greens Industrial Park, Calder Vale Road, Wakefield, WF1 5PH
Date Completed